杜239块稠油油藏吞吐后期转蒸汽驱开发可行性研究 被引量:5

Feasibility analysis of converting steam flood in the later stage of huff and puff in Du 239 block heavy oil reservoir
下载PDF
导出
摘要 曙光油田杜239块油藏投入开发二十余年,油井平均吞吐已达12个周期,处于"两高两低"的开发阶段,现开发方式难以进一步改善开发效果。结合油藏地质特点,从开发特点、剩余油分布规律研究入手,提出了适合油藏自身特点的蒸汽驱开发方案,可有效提高区块最终采收率。 Du239 block in Shuguang oilfield has developed for more than twenty years, oil well average huff and puff reached12 cycles, which is in the ' two high and two low' stage of development. The current development methods is hard to further improve the development effect. Combined with the geological characteristics, it is put forward suitable steam flooding development plan for reservoir own characteristics from the development characteristics and remaining oil distribution, which can effectively improve the ultimate recovery rate.
作者 李伟瑞
出处 《石油地质与工程》 CAS 2012年第4期88-90,8,共3页 Petroleum Geology and Engineering
关键词 稠油油藏 蒸汽驱 曙光油田 杜239块 Heavy oil reservoir steam flooding Shuguang oilfield Du 239 block
  • 相关文献

参考文献6

二级参考文献21

共引文献86

同被引文献17

引证文献5

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部