期刊文献+

钻井船插桩的大变形有限元数值模拟 被引量:3

NUMERICAL SIMULATION OF JACK-UP SPUDCAN PENETRATION USING LARGE DEFORMATION FEM
下载PDF
导出
摘要 介绍了应用一种欧拉-拉格朗日耦合的方法来模拟钻井船插桩的整个过程,得到了不同土质参数条件下的桩脚荷载-桩脚尖入泥深度的曲线,并且通过与理论公式计算结果、离心机模型试验结果的比较进一步验证了该数值模拟方法的可行性。 This paper presents the application of a Coupled Eulerian-Lagrangian approach (CEL) to simulate the continuous penetration of a jack-up spudcan foundation into the seabed. The load-penetra- tion response curve is achieved for different soil profiles and the applicability of the Eulerian finite ele- ment model is demonstrated through comparison with the theoretical calculations and the centrifuge model test data.
作者 王鹏 王建华
出处 《低温建筑技术》 2013年第2期100-101,共2页 Low Temperature Architecture Technology
关键词 自升式钻井船 桩靴 承载力 耦合欧拉-拉格朗日(CEL) jack-up drilling rig spudcan bearing capacity Coupled Eulerian-Lagrangian
  • 相关文献

参考文献6

  • 1SNAME,Guidelines for Site specific assessment of mobile jack-up units[S].Society of Naval Architects and Marine Engineers,Technical and Research Bulletin5-5A,NewJersey,1997.
  • 2SY/T6707-2008,海洋井场调查规范[S].
  • 3Craig W H,Chua K.Deep penetration of spudcan foundation onsand and clay[J].Gèotechnique,1990,40(4):541-56.
  • 4庄茁 译.ABAQUS/Explicit有限元软件入门指南[M].北京:清华大学出版社,1999..
  • 5Hibbitt,Karlsson,Sorensen,Inc.ABAQUS/Explicit User’s Manu-al,ABAQUS/CAE User’s Manual[J].USA:HKS Co,2002.
  • 6Gang Qiu,Sascha Henke.Controlled installation of spudcan foun-dations on loose sand overlying weak clay[J].Marine Structures,2011,24:528-550.

共引文献4

同被引文献26

  • 1刘君,胡玉霞,孔宪京.Deep Penetration of Spudcan Foundation into Double Layered Soils[J].China Ocean Engineering,2005,19(2):309-324. 被引量:6
  • 2Kong V W.Jack-Up Reinstallation near Existing Footprints[D].Perth,Australia:University of Western Australia,2012.
  • 3Stewart D P,Finnie I.Spudcan-footprint interaction during jack-up workovers[J].Evolutionary Ecology Research,2001,3(1):107-116.
  • 4Cassidy M J,Quah C K,Foo K S.Experimental investigation of the reinstallation of spudcan footings close to existing footprints[J].Journal of Geotechnical and Geoenvironmental Engineering,2009,135(4):474-486.
  • 5Gaudin C,Cassidy M J,Donovan T,et al.Spudcan reinstallation near existing footprints[C]//Proceedings of the 6thInternational Conference of Offshore Site Investigation and Geotechnics.Confronting New Challenges and Sharing Knowledge.London:Society of Underwater Technology,2007.
  • 6Carrington T,Hodges B,Aldridge T,et al.Jack-up advanced foundation analysis by automatic remeshing large strain FEA methods[C]//[s.l]:[s.n],1981:23-24.
  • 7Gan C T.Centrifuge model study on spudcan-footprint interaction[J].National University of Singapore,Singapore,2009.
  • 8Bolton M D,Osman A S.Simple plasticity-based prediction of the undrained settlement of shallow circular foundations on clay[J].Géotechnique,2005,55(6):355-356.
  • 9Sname.Recommended practice for site specific assessment of mobile jack-up units[C]//Technical and Research Bulletin 5-5A,First ed,Rev 3:Jersey City,NJ:Society of Naval Architects and Marine Engineers,2008.
  • 10Kong V,Cassidy M J,Gaudin C.Experimental study of effect of geometry on reinstallation of jack-up next to footprint[J].Canadian Geotechnical Journal,2013,50(5):557-573.

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部