摘要
根据设计图纸,拟建郑州轨道交通1号线火车站站———二七广场站区间隧道在里程DK31+334~DK31+355处都将穿越正在运营的郑州火车站。鉴于穿越火车站存在较大的风险,需要进行施工监控。文章对此进行了总结和探讨,为盾构施工提供了技术支持。
According to the design diagram, the being built Zhengzhou Metro Line 1 will pass through Zhengzhou railway station in DK31+334-DK31+355. Due to the great dangerous, it is essential to monitor. Those are conclude and discussed in this paper, it will provide some theoretical reference for shield construction.
出处
《企业技术开发》
2013年第2期44-46,共3页
Technological Development of Enterprise
关键词
盾构
穿越
火车站
监控
方案
shield
pass through
railway station
monitor
schedule