结合某1280m3高炉配套喷煤系统工程,简述了喷吹罐组设计的方法,重点介绍了高炉喷煤喷吹系统喷吹罐容积的确定方法、喷吹罐组的布置方式以及三罐并联式布置方式的优点。通过计算喷吹罐倒罐操作时间,验证了设计时预设的倒罐周期的合理性。
The author briefly explains the approach for the coal injection system of one 1 280 m3 BF, focusing ment method and the advantages of three-tank parallel tion time proves the reasonability of the preset cycle.
出处
《天津冶金》
CAS
2013年第1期7-9,共3页
Tianjin Metallurgy
关键词
高炉
喷煤
喷吹
系统
罐组
设计
验证
BF
coal injection
injection
system
tanks
designing injection tanks in combination with on tank capacity determination, tank arrange- layout. The calculation of tank-to-tank opera- design
proof