摘要
针对广西防城港核电一期机组2015年投运后是否参与广西电网调峰的问题,介绍了防城港核电机组及其特性,分析了广西电网的调峰需求,从技术和经济两方面分析了防城港核电机组调峰的利弊,提出了防城港核电一期机组宜带基本负荷运行,不宜进行日负荷跟踪的结论。
Aiming at problem that whether first stage nuclear units in Fangchenggang nuclear power plant should participate peak load regulation in Guangxi power grid,characteristics of Fangchenggang nuclear units are introduced, and peak load regulation demand in Guangxi power grid is analyze. Based on the advantages and disadvantages analysis from aspects of technology and economy, conclusion that Fangchenggang nuclear unit is suitable for basic load operation but is not suitable for daily load tracking operation is proposed.
出处
《广西电力》
2013年第1期56-58,72,共4页
Guangxi Electric Power
关键词
电网
调峰机组
核电机组
power grid,peak load regulation unit, nuclear unit