期刊文献+

600MW超临界机组除盐水补水系统设计方案比较 被引量:3

Comparison of Design Schemes for Salt Elimination and Water Supply System in 600 MW Supercritical Unit
下载PDF
导出
摘要 探讨600 MW级超临界机组除盐水补水系统相对最优方案,详细介绍国内在建及运行600 MW级超临界机组除盐水补水系统的设计方案,对比各方案系统流程并总结各方案优缺点,根据工程具体情况提出相对最优设计方案。 The optimal design scheme for salt elimination and water supply system in 600 MW supercritical unit is discussed. Design schemes for domestic salt elimination and water supply system in 600 MW supercritical unit under construction or being operated are introduced in detail, and system flow charts, advantages and disadvantages of each scheme are compared. The optimal design scheme should be proposed based on the actual situation of the project.
作者 邱懿兴 杨春
出处 《广西电力》 2013年第1期95-98,共4页 Guangxi Electric Power
关键词 600 MW级超临界机组 直流炉 汽包炉 除盐水补水系统 设计方案 600 MW supercritical unit, once-through boiler, drum-boiler, salt elimination and water supply system
  • 相关文献

同被引文献4

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部