8Gatta F M, Geri A.Analytical Prediction of Abnormal Temporary Over-voltage due to Ground Faults in MV Networks[J].Electric Power System Research,2007, 77(10):1305-1313.
9BAXEVANOS I S, LABRIDIS D P. Implementing multi-agent systems technology or power distribution network control and protection management [J]. IEEE Trans on Power Delivery, 2007, 22(1): 433-443.
10PEREZ-GUERRERO R, HEYDT G T, JACK N J, et al. Optimal restoration of distribution systems using dynamic programming [J . IEEE Trans on Power Delivery, 2008, 23(3) : 1589-1596.