摘要
针对嘉兴电力局省公司项目"输电线路引流板带电消缺技术研究及应用",对收集到的500kV线路杆塔资料进行分析后,根据实际塔型和尺寸,通过计算,得到开展引流板带电消缺作业时,作业人员的作业间隙及作业危险率,分析带电作业的安全性。
This paper is against on province project "The Study on Live Eliminate Defects Working On Drainage Board On Transmission Line and its' application" by Jiaxing Electric Power Bureau. We analyzed the 500kV line tower's data collected. By calculating the dates based on the actual tower type and size, we have got the working gap and hazard rate in order to analyze the security of the live eliminate defects working on drainage board on transmission line.
出处
《电气技术》
2013年第2期86-90,共5页
Electrical Engineering