大底盘地下室后浇带设置和施工的应用

Application of Late Poured Band Device and Construction to Large Chassis Basement
下载PDF
导出
摘要 文章针对后浇带在大底盘地下室的通用做法,介绍了施工后浇带的形式和相关规范规定,后浇带技术有效控制混凝土硬化形成的裂缝、解决主楼与裙房间之间的沉降差,保证结构整体性。对后浇带无缝设计技术的设计方法和施工工艺进行了探讨,并结合实际工程,介绍了现浇后浇带对于大底盘地下室的应用。 According to the general practices on the late poured band in the large chassis basement, the paper introduced the construction form of the late poured band and the related standard and regulations. The late poured band technology could effectively control the cracks occurred by the hardening of concrete and could solve the settlement difference between the main building and podium in order to ensure the structure integration. The paper had a discussion on the design method and construction technique of the late poured band seamless design technology. In combination with the actual engineering project, the paper introduced the application of the site pouring late poured band to the large chassis basement.
作者 吴新艾
出处 《煤炭工程》 北大核心 2013年第3期29-31,34,共4页 Coal Engineering
关键词 后浇带 设计原理 施工工艺 late poured band design principle construction technique
  • 相关文献

参考文献3

二级参考文献5

  • 1GB50108-2008地下工程防水技术规范[s].北京:中国计划出版社,2008.
  • 2中华人民共和国建设部.《高层建筑混凝土结构技术规程》[S].北京:中国建筑工业出版社,2002.
  • 3中华人民共和国建设部.《人民防空工程设计规范》[S].北京:中国建筑工业出版社,2005.
  • 4中华人民共和国水利部.水工混凝土结构设计规范[S].北京:中国水利水电出版社,1997.
  • 5中华人民共和国建设部.混凝土结构设计规范[S].北京:中国建筑出版社,2002..

共引文献614

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部