基于项目目标的电网建设项目施工风险模糊评价模型 被引量:3

Construction Risk Fuzzy Assessment Model of Grid Project Based on Project Objective
下载PDF
导出
摘要 为强调风险对各项目目标的直接影响、突出项目目标之间的差异性,运用三角模糊数方法建立了基于项目目标的电网建设项目风险模糊评价模型,并结合西宁市某330kV变电站项目的实际情况,运用该模型评价了变电站项目的部分施工风险,根据评价结果对风险进行了描述和排序,从而验证了模型的实用性和可行性,同时为保证模型的准确性,在模型的实际应用中需根据项目情况调整模型的相关参数。 For emphasizing the direct risk impact on each project objective and highlighting the difference among pro- ject objectives, construction risk fuzzy assessment model of grid project based on project objective was established by u sing triangular fuzzy number method. Combined with 330 kV substation project in Xining city, this paper used the model to assess some construction risks. Based on the assessment results, the risk was described and ranked, which demonstra ted the practicality and feasibility of the proposed model. Meanwhile, the model parameters should be adjusted in practical application so that the accuracy of the model could be ensured.
出处 《水电能源科学》 北大核心 2013年第3期217-219,共3页 Water Resources and Power
基金 国家自然科学基金资助项目(71071054) 华北电力大学"211工程"基金资助项目(X10012)
关键词 电网建设项目 三角模糊数 施工风险评价 项目目标 grid construction project triangular fuzzy number construction risk assessment project objective
  • 相关文献

参考文献5

二级参考文献25

共引文献11

同被引文献14

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部