摘要
某厂 6 70t/h燃煤锅炉 ,在燃煤煤种发生较大变化后 ,产生了一系列妨碍正常运行的问题。针对这一情况 ,采用实施简单、投资低廉的改造方法 。
A 670 t/h boiler in certain power plant occurred a series of problems obstructing boiler from normal operation when the coal characteristics changed significantly.Aiming at this situation,a simple and low cost boiler-modifying project is successfully applied to solve the coal adaptability problem.
出处
《河北电力技术》
2000年第5期37-38,41,共3页
Hebei Electric Power
关键词
燃煤锅炉
煤种
系统改造
coal-fired boiler,coal variety,system modification