期刊文献+

浙江发电市场中的实时调度与AGC设计 被引量:8

DESIGN OF REAL-TIME DISPATCH & AGC IN ZHEJIANG POWER MARKET
下载PDF
导出
摘要 认为发电市场技术支持系统中实时调度与 AGC指令的产生和执行 ,既要遵从市场经济的原则 ,又要保证电网的安全 ,同时必须考虑现有的一次设备和自动化系统的现状。文中结合浙江省发电侧电力市场的建设 ,介绍了市场环境下实时调度与 AGC的实施 。 Real-time dispatch and AGC are two important parts in power market. The creation and execution of real--timedispatch and AGC commands in power market system should not only obey the rule of fair and opening, but also ensure thesecurity of power grid. At the same time. the present status of generation facility and automation system should be taken intoaccount. In combination with the construction of Zhejiang power market. the paper introduces the implementation of I'ealtime dispatch and AGC in the market environment. and discusses the problems existing.
出处 《电力系统自动化》 EI CSCD 北大核心 2000年第20期59-61,共3页 Automation of Electric Power Systems
关键词 发电市场 实时调度 AGC 电力行业 电网 power market real--time dispatch AGC
  • 相关文献

参考文献2

二级参考文献9

  • 1于尔铿 刘广一 等.能量管理系统(EMS)讲座(连载)[J].电力系统自动化,1997,21(1).
  • 2华定中,电力系统,1998年,22卷,11期
  • 3宋燕敏,电力系统自动化,1998年,22卷,10期
  • 4汪恕诚,中国电力报,1998年
  • 5宋永华,中国电力,1997年,30卷,10期
  • 6韩放,电网技术,1995年,19卷,8期
  • 7于尔铿,能量管理系统,1998年
  • 8于尔铿,电力系统自动化,1997年,21卷,1期
  • 9刘广一,于尔铿,谢开,宋永华.电力市场中技术支持系统的总体结构[J].电网技术,1998,22(11):64-68. 被引量:11

共引文献33

同被引文献35

  • 1张健,唐跃中,章渊.OPEN2000AGC系统在上海电网的应用[J].电力系统自动化,2004,28(19):96-99. 被引量:2
  • 2Jaleeli Nasser , Vanslyck L S , Ewart D, et al. Understanding Automatic Generation Control. IEEE Trans on Power Systems,1992,7(3): 1106-1122.
  • 3Chown G A, Coetzee M G. Implementation of Regulation as an Ancillary Service in Eskom and Use of Eskom Internet Web for this Service. IEEE Trans on Power Systems, 2000, 15 (3):1132-1136.
  • 4Singh Harry, Papalexopoulos Alex. Competitive Procurement of Ancillary Services by an Independent System Operator. IEEE Trans on Power Systems, 1999,14(2): 498-504.
  • 5Cheung Kwok W, Shamsollahi Payman, Sun David, et al.Energy and Ancillary Service Dispatch for the Interim ISO New England Electricity Market. IEEE Trans on Power Systems,2000,15 (3): 968-974.
  • 6Fosso B Olav, Gjelsvik Anders, Haugstad Arne , et al.Generation Scheduling in a Deregulated System--The Norwegian Case. IEEE Trans on Power Systems, 1999,14( 1):75-81.
  • 7Australian National Electricity Code, Version 2. 0. http://electricity. net. au/coderule. htm.
  • 8武亚光,李卫东,吴海波,等(Wu Yaguang,Li Weidong,Wu Haibo,et al).我国发电市场中AGC机组调配框架的研究(Framework of AGC Unit Selection After Deregulation).电力系统自动化(Automation of Electric Power Systems),2003,27(2):37~40.
  • 9陈国良,王煦法,庄镇泉,等(Chen Guoliang,Wang Xufa,Zhuang Zhenquan,et al).遗传算法及其应用(Genetic Algorithm and Its Application).北京:人民邮电出版社(Beijing:People’S Posts and Telecommunications Publishing House),1996.People's Posts and Telecommunications Publishing House),1996.People's Posts and Telecommunications Publishing House),1996.
  • 10Chen Haoyong, Wang Xifan. Cooperative Coevolutionary Algorithm for Unit Commitment. IEEE Trans on Power Systems, 2002,17(1) : 128-133.

引证文献8

二级引证文献94

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部