基于复合材料桥塞的水平井套管分段压裂技术 被引量:26

Research on the Staged Fracturing of Cased-completion Horizontal Hole with Composite Material Bridge Plug
下载PDF
导出
摘要 介绍了基于复合材料桥塞的水平井套管完井分段压裂工艺管柱结构、工艺过程和关键技术。阐述了该工艺管柱中关键部件——复合材料桥塞和电缆坐封工具的结构、工作原理及性能特点。现场应用情况表明,复合材料桥塞可正常坐封丢手,射孔发射率100%,平均每个复合材料桥塞钻铣时间为30 min,达到国外标准;水平井套管分段压裂管柱结构合理,工艺优良,性能可靠,能够满足页岩气水平井射孔压裂联作的分段完井要求。建议进一步优化钻铣复合材料桥塞工艺和工具,扩充桥塞尺寸规格,使其形成系列化,以满足油田不同规格套管的需求。 The structure of the staged fracturing technology string for cased-completion horizontal well with composite material bridge plug was introduced. The structure, operating principle and performance features of the key parts of the string, namely the composite material bridge plug and cable setting tool, were also introduced. The string can be safely run into the hole, and its multi-level initiation device works reliably and the plug is drillable and millable. The field application shows that the string is reasonable in configuration, feasible in structure and reliable in performance. It takes 30 minutes to finish drilling and milling a bridge plug on average. The technology of the string is desirable and it can satisfy the requirement of staged completion of shale gas horizontal wells by perforation and fracture co-operation. It is suggested that a further optimization of the technology and tool of drilling and milling composite bridge plug should be conducted. The dimensions and specification of the plug should be enlarged and it should be serialized in order to satisfy the requirement of different casing specifications in oilfields.
出处 《石油机械》 北大核心 2013年第3期44-47,共4页 China Petroleum Machinery
基金 中石化科技部项目"复合材料桥塞分段封隔技术研究"(JP11012)
关键词 复合材料桥塞 页岩气 水平井 分段压裂 电缆坐封工具 钻铣 composite material bridge plug shale gas horizontal well staged fracturing cable setting tool drilling and milling
  • 相关文献

参考文献5

二级参考文献56

共引文献287

同被引文献301

引证文献26

二级引证文献257

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部