摘要
为扩大重庆市某供水工程的供水能力、提高供水水质,提出了对该系统进行挖潜扩容、增加深度处理单元等改造设计,并对改造前后工艺、水质进行了对比。实践表明改造设计达到了预期效果,对处理同类供水问题具有指导意义。
In order to increase the capacity of a water supply project in Chongqing and improve the water supply quality, the reconstruction design of the system, such as tapping the potential, expandingthe capacity, adding the advanced treatment unit and so on was proposed, and the process and water quality before and after the reconstruction were compared. The practice showed that the reconstruction de- sign achieved the expected effect, and it is helpful to address the similar water supply problem.
出处
《中国给水排水》
CAS
CSCD
北大核心
2013年第6期55-57,共3页
China Water & Wastewater
关键词
供水工程
常规处理
技术改造
深度处理
water supply project
conventional treatment
technical reconstruction
ad-vanced treatment