摘要
以中国(太原)煤炭交易展览中心水炮电气调试过程中出现的问题处理为例,通过对变压器容量、长延时、短延时、软启等基础知识的运用,对现场实际问题进行准确地分析,并正确地找到处理方法,进一步说明了基础知识积累在工程实际运用中的重要性。
This paper propose, based on the transformer capacity, long delay, short-time delay, soft start and other basic knowledge to understand the use of the actual problem, accurate analysis, so as to correctly find the way, further illustrating the importance of the accumulation of basic knowledge in the application of practical use
出处
《重庆理工大学学报(自然科学)》
CAS
2013年第2期116-118,共3页
Journal of Chongqing University of Technology:Natural Science
关键词
变压器容量
整定电流
长延时
短延时
软启设置
the capacity of the transformer
the current setting
long delay
short-time delay
soft start setting