期刊文献+

煤矿瓦斯抽排立眼套管安设及水泥固井工艺探讨 被引量:1

Discussion on Casing Installation for Methane Drainage Vertical Borehole and Cementing Process in Coalmine
下载PDF
导出
摘要 在煤矿瓦斯抽排立眼施工的过程中,套管安设及水泥固井是2个关键性的工序,如果出现失误,便可能产生严重的工程事故,甚至可能使整个工程报废。通过对坪上煤矿瓦斯抽排立眼工程的套管安设及水泥固井工序的施工,吸取了一些套管安设的事故教训,总结了一些套管安设、水泥固井的经验,可对今后类似工程的安全施工提供帮助。 In the construction process of methane drainage vertical borehole in coalmine, the casing installation and cemen- ting are very important. By the construction practice of methane drainage vertical borehole and cementing process in Pings- hang coalmine, this article presented some lessons from the accident and summed up the experiences of casing installation and cementing for the similar projects in the future.
出处 《探矿工程(岩土钻掘工程)》 2013年第2期56-58,63,共4页 Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词 煤矿瓦斯抽排立眼 套管安设 水泥固井 methane drainage vertical bore casing installation cementing
  • 相关文献

参考文献5

二级参考文献12

  • 1袁志坚,白领国.大口径瓦斯抽排孔钻探施工[J].西部探矿工程,2007,19(10). 被引量:3
  • 2编写组.钻井手册(甲方)[M].北京:石油工业出版社,1990.
  • 3编写组.钻井监督(上册)[M].北京:石油工业出版,2003.
  • 4MT/T1076-2008,煤炭地质钻探规程[s].
  • 5SYT5724-2008,套管柱结构与强度设计[s].
  • 6SYT5412-2005,下套管作业规程[s].
  • 7沈季良 等.建井工程手册[M].北京:煤炭工业出版社,1986.7.
  • 8陈平,周开吉,刘绘新,等.钻井完井工程[M].北京:石油工业出版社,2005.
  • 9李云峰.淮南丁集矿瓦斯排放井施工技术[J].中国煤田地质,2007,19(A01):31-33. 被引量:5
  • 10GBJ213-90.矿山井巷工程施工及验收规范[S].

共引文献23

同被引文献4

引证文献1

相关作者