摘要
通过对南阳坡矿8#层含水构造进行地面勘探和井下勘探结合,物探与钻探相结合的方法进行预探,消除了8#层水害,保证了安全生产。
Based on Nanyar/g slope mine water - bearing structure 8# layer ground exploration and underground exploration, geophysical and drilling com- bined with the method of combining the preliminary exploration, eliminates the 8# layer water, ensure safety production.
出处
《山东煤炭科技》
2013年第1期197-198,共2页
Shandong Coal Science and Technology
关键词
地面勘探
物探
钻探
防治水
ground exploration geophysical drilling water prevention and control