摘要
介绍了锡铁山铅锌矿副井壁后注浆施工方案,浆液的调制和试验,以及注浆的实施。注浆取得了较好的治水效果,为高海拔类似地质条件的水防治提供借鉴。
This paper introduced the scheme of backwall grouting in the auxiliary shaft of Xitieshan Lead-zinc Mine, the slurry modulation and test, and the grouting practice. The water control effect was satisfying. These results can provide reference for the water control at similar altitude and geological situations.
出处
《中国矿山工程》
2013年第1期1-3,30,共4页
China Mine Engineering
关键词
井筒
防治水
壁后注浆
shaft
water control
backwall grouting