摘要 浅埋暗挖隧道施工产生的地表沉降是施工过程中令人关注的问题,采用数值试验的方法,通过模拟假设、建立模型和数值计算,研究了相邻隧道断面不同布置方式和注浆材料参数对地表沉降的影响.结果表明:隧道埋深越深,越需要大的隧道间距来实现沉降槽的双峰状态.在隧道埋深为2倍洞径时,倾斜布置条件下双隧道的垂直距离和水平距离接近2.5倍洞径时产生的地面沉降较小,垂直布置条件下双隧道间距越大,产生的地面沉降越小.拱顶注浆对控制地表沉降有明显效果,注浆参数提高要比注浆层厚度增加的效果好. Ground settlement is an issue of common concern in shallow-buried parallel tunnel construction, especially in urban metro section construction. This paper presents a parametric study to investigate the influence of some important factors on ground settlement using numerical experiment method. The results indicate that the bimodal soil settlement results from the large tunnel center space and deep tunnel buried depth. The smaller ground settlement is achieved when horizontal distance and vertical distance are both close to 2.5D in inclined alignment and the bigger tunnel space in vertical alignment with the 2D tunnel depth. Grouting is very effective to control arch crown settlement. Improving the gouting parameters is better than increasing the thickness of grouting layer to control the arch crown settlement.
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 北大核心 2013年第3期439-443,共5页 Journal of Northeastern University(Natural Science)
基金 "十二五"国家科技支撑计划项目(2012BAK24B01) 中央高校基本科研业务费专项资金资助项目(N110301003)
关键词 平行隧道施工 数值试验 地表沉降 注浆 隧道埋深 parallel tunnels construction numerical experiment ground settlement grouting tunnel depth
  • 相关文献

参考文献4

二级参考文献56

共引文献182

同被引文献71

引证文献7

二级引证文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部