期刊文献+

基于网络分析法的工程项目投标风险模糊分析

Fuzzy Risk Assessment of Construction Project Bidding Based on Analytic Network Process Method
下载PDF
导出
摘要 针对施工单位如何在投标阶段有效地分析工程项目的风险问题,提出基于网络分析法的风险评价模型。首先介绍工程量清单模式下项目投标风险来源,然后通过风险辨识找出主要风险因素。充分考虑风险因素间的相关性,引入网络分析法(ANP)进行赋权,进一步建立拟投项目对所有风险因素的模糊隶属矩阵,从而有效评估出拟投标项目的风险大小。最后以某工程项目进行实例分析,结果表明该评价模型不但能有效满足投标决策,还可为将来的风险管理提供基础数据。 According to the problem of how to analyze project risk effectively in bidding stage for contractors, a new model with analytic network process method is proposed. Firstly, this paper introduces the risk - emergence resources with the BQ model policy. Then, the main risk factors have been identified, and considering about the relationship among them, all weights are given with analytic network process (ANP). Secondly, all risk factors "fuzzy matrix subjection to evaluation ranks has been founded. Thirdly, the risk evaluation results have been worked out with fuzzy comprehensive evaluation method. Finally, a certain construction project is taken as an example to prove that this evaluation model can not only effectively satisfy the bidding decision - making but also can provide basic data for the future risk management of site construction.
作者 易欣
出处 《淮阴工学院学报》 CAS 2013年第1期66-72,共7页 Journal of Huaiyin Institute of Technology
关键词 网络分析法 工程项目 投标报价 模糊风险分析 analytic network process construction project bidding price fuzzy risk assessment
  • 相关文献

参考文献12

二级参考文献34

  • 1龙爱翔.工程项目投标的报价决策[J].系统工程,1994,12(6):39-42. 被引量:16
  • 2胥悦红.马氏链在国际工程投标风险预测中的应用研究:学位论文[M].天津:天津大学图书馆,1997.38-50.
  • 3易欣.基于工程量清单模式的报价风险分析与决策[D].长沙:中南大学.2005.
  • 4詹姆斯·R·埃文斯,戴维·L·奥尔森.模拟与风险分析[M].上海:上海人民出版社.2001.
  • 5胥悦红,学位论文,1997年,38页
  • 6Gates. M. Bidding Strategies and Probabilities[ A ]. Construction Division. ASCE, 1967.
  • 7Cooper, Dale F. Risk analysis for Large Project:Models, Methods and Cases[ J]. John Wiley & Sons Ltd, 1987.
  • 8Orlovsky S.A. Decision-making With a Fuzzy Preference Relation[ J]. Fuzzy Sets and Systems, Vol. 1, No.3,1978.
  • 9Gadsdon J. Chapman C. B. Risk analysis as a control feature in project management [ A ]. Transactions of the 7th International Cost Engineering Congress[ C]. London: 1982, C3 - 1 - C3 - 11
  • 10Larry G. Crowley, Member, ASCE, and Domm E. Haneher, Fellow, ASCE. Risk Assessment of competitive procurement[J]. the Journal of Construction Engineering and Management, June, 1995.

共引文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部