随着石武高速铁路及郑州东站的引入,郑州铁路枢纽布局和设备发生较大变化。结合联调联试组织工作实践,分析郑州枢纽试验组织的主要难点与问题,通过强化组织领导,提供组织保证;建立健全规章制度,提供技术保证;编制运输组织方案,提供行车保证;强化施工安全管理,确保设备质量提升;建立会议制度,及时协调解决问题;严格整改销号制度,实现闭环管理等措施,圆满地完成了郑州铁路枢纽互联互通试验工作。
Following with the introducing Shijiazhuang-Wuhan high-speed railway into Zhengzhou East Station, the distdbutiorl and equipments in Zhengzhou railway hub had great change. Combined with organization work practice of integration test and commissioning, this paper analyzes the main difficulties and problems of Zhengzhou hub test organization, and puts forward that through the measures such as strengthening organization leader as to provide organization guarantee; establishing right regulations and systems as to provide technical guarantee; drawing transport organization program as to provide train running guarantee; enhancing construction safety management as to ensure the increase of equipment quality; establishing conference system as to harmonize and resolve problems in time; strictly integrating the number-eliminating system as to realize closed-loop management, all of these measures could well complete the integration test and commissioning works in Zhengzhou hub on schedule.
出处
《铁道运输与经济》
北大核心
2013年第3期12-15,共4页
Railway Transport and Economy
关键词
高速铁路
联调联试
郑州枢纽
信号系统
High-speed Railway
Integration Test and Commissioning
Zhengzhou Hub
Signal System