铁路工程EPC模式,基本涵盖了工程建设的全过程。设计单位作为EPC项目的总承包商,如何在施工阶段进行质量管理,保证施工质量,此文结合大连机车接轨区工程,探讨EPC模式施工阶段的质量管理方法和要点,论述质量控制点的设置、控制内容及管理流程,期望在提高工程质量和管理水平的同时,也能提高设计单位对工程建设的管理能力。
Railway engineering EPC mode basically covers the whole process of engineering construction. As the EPC general contractor of the project, design unit should perform the quality management in construction stage to guarantee the construction quality. Combined with Dalian locomotive line engineering, this article discusses the construction stage of quality management methods and main points of the EPC model, the setting of quality control points, control content and management process. It is expected to improve the engineering quality and management level, at the same time, to improve the management ability of design unit in engineering construction.