基于模糊故障树方法的钻井平台井喷概率计算 被引量:7

Probability Calculation of Blowout of Drilling Platform Based on Fuzzy Fault Tree Method
下载PDF
导出
摘要 基于模糊理论,提出了一种定量风险评估方法——模糊故障树方法。查阅历史数据库或者借助专家判断,给出故障树模型中各基本事件发生可能性的模糊数表示。考虑到不同专家意见之间可能存在的差异,给出了处理专家意见的运算法则及确定专家权重的理论方法。以半潜式钻井平台发生井喷为顶事件,构建了故障树模型,依据给出的模糊故障树理论模型,计算得到半潜式平台在钻进或固井过程中发生井喷的概率。 Based on fuzzy theory, a quantitative risk assessment method called fuzzy fault tree analysis is presented. By referring to risk database or by dint of expert judgements, this paper presents occurrence possibility of each basic event in the fault tree model which is expressed in the form of fuzzy numbers. Since each expert may have a different opinion, this paper developes an algorithm to aggregate expert opinion and a method to determine the importance weight of expert opinion. This paper constructs fault tree model on blowout of semi-submersible drilling platform. According to fuzzy fault tree analysis method, the probability of blowout is calculated during drilling or cementing on a semi-submersible drilling platform.
出处 《中国造船》 EI CSCD 北大核心 2013年第1期155-165,共11页 Shipbuilding of China
关键词 定量风险评估方法 模糊数学 故障树 钻井平台 井喷 quantitative risk assessment method fuzzy mathematics fault tree drilling platform well blowout
  • 相关文献

参考文献11

  • 1TANAKA H, FAN L T, LAI F S, TOGUCHI K. Fault tree analysis by fuzzy Probability[J]. IEEE Transactions on Reliability, 1983, 32: 453-457.
  • 2SINGER D. A fuzzy set approach to fault tree and reliability analysis[J]. Fuzzy Sets and Systems, 1990, 34: 145-155.
  • 3HUANG H Z, TONG X, ZUO M. Posbist fault tree analysis of coherent systems[J].Reliability Engineering and System Safety, 2004, 84: 141-148. .
  • 4HSU H M, CHEN T C. Aggregation of fuzzy opinion under group decision making[J].Fuzzy Sets and Systems, 1994, 79: 279-285.
  • 5CHEN S. A new similarity measure of generalized fuzzy numbers based on geometric-mean averaging operator[C]//Anon. 2006 IEEE International Conference on Fuzzy Systems. Vancouver, BC, Canada: Institute of Electrical andElectronics Engineers Inc., Piscataway, NJ 08855-1331, United States, 2006:1879-1886.
  • 6Miri LAVASANI S M, YANG Z, FINLAY J, WANG J. Fuzzy risk assessment of oil and gas offshore wells[J]. Process Safety and Environmental Protection, 2011, 89: 277-294.
  • 7AN M. Risk assessment in railway safety management[J].Intemational Journal of Engineering and Technology, 2007, 14: 45-56.
  • 8PILLAY A, WANG J. A risk ranking approach incorporating fuzzy set theory and grey theory[J]. Engineering Reliability &System Safety,2003, 79(1): 61-67.
  • 9ONISAWA T. An approach to human reliability in man-machine systems using error possibility[J]. Fuzzy Sets and Systems, 1988, 27: 87-103.
  • 10刘刚,金业权.钻井井控风险分析与控制[M].北京:石油工业出版社,2011.

共引文献7

同被引文献69

引证文献7

二级引证文献52

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部