期刊文献+

闹德海水库除险加固期供水探析 被引量:1

Discussion on water supply in period of strengthening and elimination dangers for Naodehai reservoir
下载PDF
导出
摘要 本文根据闹德海水库流域的自然地理环境,以及除险加固工程的计划安排,针对施工期间供水存在的问题,开展有针对性的试验研究。模拟施工期渗流取水方案,进行室外原型观测试验,通过对过滤前后的浊度、流量进行对比分析,寻找合理、可行的取水方案。 Based on the physical geographic environment of Naodehai reservoir basin and the plan arrangement of strengthening and elimination dangers project,the paper carries out the targeted experimental research according to the water supply questions in construction period.The outdoor prototype observation experiment is made by simulating the seepage water intake in construction period.The paper compares and analyzes the turbidity and discharge before and after the filtration and finds the reasonable and feasible water intake scheme.
出处 《东北水利水电》 2013年第3期56-58,72,共3页 Water Resources & Hydropower of Northeast China
关键词 闹德海水库 供水 实验 除险加固期 Naodehai reservoir water supply experiment in period of strengthening and elimination dangers
  • 相关文献

同被引文献8

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部