摘要
主要介绍了石膏山水库导流泄洪洞进水塔详细设计过程,通过对进水塔的稳定分析、结构计算,表明该进水塔体型选择合理、满足设计规范要求。
This paper describes the detailed design process of the intake tower of Shigaoshan Reservoir’s diversion spillway tunnel,Through the analysis of the stability of the intake tower and structure calculations it is shown that the selection of intake tower type is reasonable,to meet the design specifications.
出处
《山西水利科技》
2013年第1期31-33,共3页
Shanxi Hydrotechnics
关键词
石膏山水库
进水塔
体型
设计
Shigaoshan Reservoir
intake tower
type
design