摘要
介绍了黄河万家寨水电站5号水轮发电机组扩大性大修监理工作,且就机组大修项目质量、进度、投资、安全以及组织协调等监理控制要点进行简要论述。
The paper introduces the job to supervise the extensive major repair of the NO.5 hydroelectric generating set of Yellow River Wanjiazhan Hydropower Station,and briefly states the main points of supervision control from some aspects such as the quality of major repair,repair progress,investment,security and organization coordination.
出处
《山西水利科技》
2013年第1期47-48,50,共3页
Shanxi Hydrotechnics
关键词
水轮发电机组
监理
大修
hydroelectric generating set
supervision
major repair