摘要
以武汉地铁4号线一期第四标段铁机村站~岳家嘴站盾构区间为背景,详细介绍了在盾构小净距平行隧道施工的情况下采取的加固措施,并通过各种监测表明,这些措施能够满足工程实际的需要。
Based on Wuhan Metro Line 4 phase fourth section Tie Jicun Station to Yue Jiazui Station, this paper de- scribed in detail the reinforcement measures in the shield tunnel construction of small spacing parallel. Through various monitorings, this paper indicated that these measures can meet the need of engineering practice.
出处
《建材世界》
2013年第1期74-76,共3页
The World of Building Materials
关键词
小净距
地铁
隔离桩
盾构
隧道
small interval metro partition wall shield
tunnel