为了满足不断扩大的产能需要,钢筋混凝土框剪结构井塔作为金属、非金属矿业的主提升系统之一,正向超高、多层、较多外凸扶壁方向发展,文章以大截面超高井塔为例介绍电动新型液压自动爬升模板的施工应用技术,阐明井塔爬模系统、施工工艺、施工要点等,起到了节约周材和劳动力、保证施工质量和安全、提高施工效率的良好效果,为今后类同结构工业建筑施工提供了借鉴。
In order to meet the needs of expanding production capacity, reinforced concrete frame structure well tower as metal, not one of the main hoisting system of metal mining, is high, multilayer, more convex buttress direction development, construction technology in large section and super high tower as an example to introduce the electric hydraulic automatic climbing formwork, clarify the well tower climbing formwork system, construction process, construction points, thereby saving material and labor week, to ensure the construction quality and safety, improve the efficiency of construction of good results, provide a reference for the future similar structure of industrial construction.
出处
《价值工程》
2013年第8期84-86,共3页
Value Engineering
关键词
液压
自动爬模
井塔
体系
方案
hydraulic
automatic climbing formwork
tower
system
scheme