摘要
本文首先介绍了脚手架施工工艺和技术要求,接着阐述了某工程悬挑脚手架设计的具体情况,最后对双排扣件式悬挑脚手架在某工程施工和应用中存在问题进行验算,通过分析和研究为双排扣件式悬挑脚手架施工应用等问题的进一步研究提供借鉴。
This paper first introduces the scaffolding construction technology and technical requirements, then a project cantilevered scaffolding design checking, and finally double-breasted piece cantilevered scaffolding in a construction and application problems, through analysis and research provide a reference for further study of the problem of the double-breasted piece cantilevered scaffolding construction applications.
出处
《价值工程》
2013年第8期140-141,共2页
Value Engineering
关键词
双排扣件
悬挑脚手架
施工验算
double-breasted piece
cantilevered scaffold
construction checking