摘要
提升机安装完成、调试合格后进行挂绳挂罐;采用隔离法处理扁绳交叉问题,使程村矿井既能早日投产,又能节约投资。
After elevator installation and debugging, the rope and cage is hung. The treatment of flat rope cross by using isolation method can make it soon put into operation, also save investment.