摘要
本文主要讨论了施工控制的因素、任务与工作内容以及控制方法对大跨连续梁桥的影响;简要阐述了预应力混凝土梁(板)施工过程中质量缺陷的原因及对策。
This paper mainly discusses the factors, tasks and job content of construction control, and the impact of control method on long-span continuous beam bridge, and describes the causes and countermeasures of quality defects when constructing prestressed concrete heam (plate).
出处
《价值工程》
2013年第9期123-124,共2页
Value Engineering
关键词
大跨度连续梁桥
施工控制
预应力
张拉施工
质量控制
long-span continuous beam bridge
construction control
prestressed
tension construction
quality control