期刊文献+

ZYWL-6000D型水平定向钻机动力头的研究 被引量:5

Study on the Power Head of ZYWL-6000D Drilling Machine
下载PDF
导出
摘要 为了研制出适合煤矿井下水平定向钻进的定向钻机,文章对ZYWL-6000D型水平定向钻机的关键元部件动力头进行了研究;文章通过类比法确定了动力头总体结构,并利用斜面增力机构设计了新型制动装置,利用液控单向阀设计了新型开闭可控式胶套卡盘,并通过双通道配油套实现了对卡盘的控制;样机实验室实验中,动力头的最大传递转矩达到6901N.m,制动装置制动转矩达到4002N.m;样机工业型试验中,动力头累计无故障钻进14000米;实验室实验和工业性试验结果表明,该动力头整体性满足煤矿井下千米定向钻进施工要求。 The head power is the key component of the ZYWL-6000D horizontal directional drilling machine used in coal mining. By analogy method, the structure of the power head is schemed, and a slope force-amplifier is used in braking, the rubber sleeve chuck in controlled by a pilot-controlled check valve to open and close through a double-channel distributor, in the experiment of the model machine, the maximum torque of the head power is up to 6901N.m, the braking force is up to 4002N.m. In the industrial test, the drilling machine has drilled more than 14000m, and the head power works well. The experimentation and the industrial test show that the head power is qualified to drill with the horizontal directional drilling machine.
出处 《价值工程》 2013年第10期33-36,共4页 Value Engineering
基金 十二五"国家科技重大专项"大型油气田及煤层气开发专项""Φ73mm无磁孔底马达的研制"任务(2011ZX05041-001-002)
关键词 动力头 制动装置 斜面增力机构 开闭可控胶套卡盘 间隙密封 双通道配油套 head power braking apparatus slope force-amplifier open and closed controllable rubber sleeve chuck clearance seal double-channel oil distributor
  • 相关文献

参考文献6

二级参考文献15

  • 1XuLi ZhangGuozheng MaWeiguo TangShizhong LiYiliang GeXindong GuZhen.Research on no Dig Directional Drilling Pipeline Laying Technique —The reseach on directional drilling tool[J].工程科学(英文版),2004,2(4):75-82. 被引量:1
  • 2赵丁选,杨力夫,李锁云,尚涛,乌效鸣.国内外非开挖定向钻机及其智能控制技术[J].吉林大学学报(工学版),2005,35(1):44-48. 被引量:17
  • 3孙惠学 等.中国工程机械学会2002年年会论文集[A]..冲击式压路机设计关键技术研究[C].汕头:汕头大学出版社,2002..
  • 4机械设计手册编委会.机械设计手册[K].5版.北京:机械工业出版社,2005.
  • 5张志涌.精通MATLAB6.5版[M].北京:北京航空航天大学出版社,2003..
  • 6邓爱民 肖娇美 田流.现代非开挖施工机械[M].北京:人民交通出版社,2003..
  • 7P 德兰斯菲尔德著,大连工学院液压教研室译.液压控制系统的设计与动态分析[M].北京:科学出版社,1981:4(6;130-131.
  • 8Yang H Y,Yang Jian,Xu Bing.Computational simulation and experiment research on speed control of VVVF hydraulic elevator[J].Control Engineering Practice,2004,(12):563(568.
  • 9Struzziery J J,Spruch A A A,Blondin C A.Trenchless pipeline for urban renewal project[J].Journal of New England Water Environment Association,1998,32(2):118-125.
  • 10Wu M C,Tung P C,Hsieh T Y.Improvement of the horizontal directional drilling method by using an autonomous land vehicle with a radio direction finding system[J].Automation in Construction,2002,(11):75-88.

共引文献24

同被引文献13

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部