基于“4C”模型的FPSO资产完整性评估 被引量:1

FPSO Asset Integrity Assessment Based on “4C” Model
下载PDF
导出
摘要 针对浮式生产储存卸货装置(FPSO)的特点,分析了将其作为资产实施完整性管理的必要性。针对FPSO资产复杂性和管理的必要性,提出利用"4C"模型对资产各阶段进行全面评估,确定资产完整性等级,并得到影响其完整性的主要因素,以此,为提高FPSO资产的可靠性、安全性及改进措施提供依据。 The paper analyzes the essentiality of asset integrity management based on FPSO characteristics. With the FPSO asset complexing and management required, it puts forward 4C model by the way of thorough evaluation for every phase of asset, then determines asset integrity grade and obtains the main influencing factors, which provide evidences for improving the reliability, safety, and updating measures of FPSO.
出处 《电子科技大学学报(社科版)》 2013年第1期55-59,共5页 Journal of University of Electronic Science and Technology of China(Social Sciences Edition)
基金 天津市自然科学基金课题"海上拼装式多功能作业平台技术"(NO.07JCYBJC13100) 船艇装备保障设备资产管理研究横向课题
关键词 资产完整性 FPSO “4C”模型 评估方法 asset integrity FPsO 4C model assessment method
  • 相关文献

参考文献10

  • 1赵耕贤.FPSO设计综述[J].中国海洋平台,2006,21(1):1-5. 被引量:28
  • 2SCHNEIDER J,GAUL A J. Asset managementtechniques[J]. Electrical Power and Energy System, 2006(28):634-654.
  • 3BEARD J W, SUMNER M. Seeking strategicadvantage in the post-net era: viewing ERP systems from theresource-based perspective[J]. The Journal of StrategicInformation Systems, 2004(13):129-150.
  • 4许涛,赵军凯,朱宪,谭家翔,王胜.基于风险分析的FPSO资产完整性管理[J].安全与环境工程,2009,16(6):85-87. 被引量:8
  • 5余建星,张中华.基于风险的检测(RBI)技术在FPSO上的应用[J].海洋技术,2009,28(2):77-79. 被引量:9
  • 6赵耕贤.浮式生产储油船(FPSO)设计[J].上海造船,2002(2):4-8. 被引量:25
  • 7赵耕贤.海上油田浮式生产储油船船型优化研究技术总结报告[R].中国船舶工业集团公司第七○八研究所,2002.12..
  • 8张藜.LNG资产完整性管理[C]//2007国际炼油技术进展交流会论文集.北京:中国石油和石化工程研究会,2007.
  • 9RAHIM Y, KENETT R S. The 5C model: A newapproach to asset integrity management[J]. International Journalof Pressure Vessels and Piping,2010(87): 88-93.
  • 10SCHRODER H M. Managerial competence:the key toexcellence.Iowa[M]. New Zealand: Kendall Hunt, 1989.

二级参考文献27

  • 1李典庆,张圣坤,唐文勇.基于风险的船体结构腐蚀优化检测及维修规划[J].上海交通大学学报,2004,38(11):1875-1879. 被引量:9
  • 2谢昊彬,陈根.曹妃甸浮式生产储油船中央控制系统分析和研究[J].船舶,2004,15(6):22-28. 被引量:5
  • 3赵耕贤.浮式生产储油船(FPSO)设计[J].上海造船,2002(2):4-8. 被引量:25
  • 4Ronhan A,Goyet J,Faber M H,2004.Industrial implementation of risk based inspection planning methods.Lessons learnt from experience(2)The case of steel offshore struetures.In Proceeding of the 23rd International Conference on Offshore Mechanics and Arctic Engineering,no OMAE2004/S&R-51573.
  • 5Lanquetin B,TOTAL S A.Floating Units Integrity Management and Life Cycle Enhancement.Offshore Europe 2005 Conference,Aberdeen,6-9 September 2005.
  • 6M H Faber,S Engelund,J D Sorensen and A Bloch.Simplified and Genetic Risk Based Inspection planning.OMAE 2000,S&R paper 6143.New Orleans,USA,
  • 7J Goyet,D Straub and M H Faber.Risk Based inspection planning of offshore installations.Structural Engineering International,Volume 12,number 3,August 2002.
  • 8M Faber.Risk Based Inspection:The framework.Structural Engineering International,Volume 12,number 3,August 2002.
  • 9P Biasotto and A Rouhan.Survey and Inspection management for FPSO.OMAE 2004,Safety and Reliability Symposium,paper 51433,June 2004,Vancouver,Canada.
  • 10[2]Phillips China Inc.FPSO Parameters and Basis.April 2002

共引文献62

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部