期刊文献+

基于定期检修α-幂过程可修系统更换模型 被引量:1

A Replacement Model for Regular Overhauling α-power Process Repairable System
下载PDF
导出
摘要 研究一种定期检修α-幂过程维修更换模型.系统在每个周期的检修时间逐渐增加,且检修"修复如旧"以及故障维修"修复如新"假设情况下,建立了以系统的修理次数N为更换策略的数学模型.利用更新理论和α-幂过程理论,给出了系统经长期运行单位时间内的期望效益的表达式,并数值模拟得到了系统的最优更换策略N*. A new regular overhauling α-power process maintenance model was studied.It was assumed that the overhauling time increased in neighboring cycle,and the random overhauling was "as good as old" and the failure repair was not "as good as new".The replacement policy N based on repair number was considered.By using renewal and α-power process theory,an explicit expression of the long-run expected profit per unit time was derived.The optimum replacement policy N* could be obtained by a numerical simulation example.
出处 《郑州大学学报(理学版)》 CAS 北大核心 2013年第1期38-41,共4页 Journal of Zhengzhou University:Natural Science Edition
关键词 可修系统 定期检修 更新过程 α-幂过程 期望效益 repairable system regular overhauling renewal process α-power process expected profit
  • 相关文献

参考文献6

二级参考文献30

共引文献15

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部