摘要
Neutral beam injection (NBI) is recognized as one of the most effective means for plasma heating. A 100 s long pulse neutral beam with 30 keV beam energy, 10 A beam current and a 100 s long pulse modulating neutral beam with 50 keV beam energy, 16 A beam current were achieved in the EAST neutral beam injector on the test-stand. The preliminary results suggest that EAST-NBI system initially possess the ability of long pulse beam extraction.
Neutral beam injection (NBI) is recognized as one of the most effective means for plasma heating. A 100 s long pulse neutral beam with 30 keV beam energy, 10 A beam current and a 100 s long pulse modulating neutral beam with 50 keV beam energy, 16 A beam current were achieved in the EAST neutral beam injector on the test-stand. The preliminary results suggest that EAST-NBI system initially possess the ability of long pulse beam extraction.
基金
supported by National Natural Science Foundation of China (No. 11075183)