摘要
对地铁车站附属结构的明挖施工过程进行了数值模拟,预测了施工过程引起的邻近建筑物的竖向变形、横向变形及倾斜,确定了既有建筑物变形的控制指标,并给出了评估建议。
According to the numerical simulation of the construction of affiliated structures of a subway station, vertical settlement, horizontal displacement and inclination of existing buildings were predicted. Control values of deformation were selected and assessment on the safety of existing buildings was made.
出处
《山西建筑》
2013年第10期57-59,共3页
Shanxi Architecture
关键词
车站附属结构
明挖施工
邻近建筑物
数值分析
affiliated structures of subway station
ground excavation
nearby buildings
numerical analysis