期刊文献+

堆场龙门吊调度问题研究 被引量:3

Research of container yard crane scheduling problem
下载PDF
导出
摘要 在集装箱码头作业中,龙门吊是非常重要的码头资源,如何更合理地调度龙门吊对减少船舶在港时间,提高码头效率有重要意义。在综合考虑龙门吊在时间和空间上的不可跨越性以及其他约束条件的基础上,建立了龙门吊调度问题的混合整数规划模型,目标是使得集卡的等待时间最短。由于问题计算的复杂性,引进遗传算法来求解模型;算例验证了算法的有效性,与已有的模型进行比较,证明了该模型的优越性。 Yard crane is the very important resource in container terminal. How to schedule the yard crane is very important to reduce the turnaround time of containership and improve terminal efficiency. Based on integrally considering the interference between two yard cranes with overlap-ping time and other constraints, a mixed integer programming model for yard crane scheduling is built in order to minimize the waiting time of the truck. Due to the computational intractability, a method called Genetic Algo- rithm is introduced to solve the model. According to example analysis, performability of the method is verified, and compared with the existing model, the superiority of this model is proved.
出处 《计算机工程与应用》 CSCD 2013年第7期267-270,共4页 Computer Engineering and Applications
基金 上海市自然科学基金创新行动计划项目(No.10190502500) 上海市科委工程中心项目(No.09DZ2250400) 上海市教委重点学科项目(No.J50604)
关键词 集装箱码头 堆场龙门吊 遗传算法 container terminal yard crane Genetic Algorithm(GA)
  • 相关文献

参考文献9

  • 1Lai K,Lam K.A study of container yard equipment alloca- tion strategy in Hong Kong[J].Intemational Journal of Mod- eling and Simulation, 1994,14(3) : 134-138.
  • 2Lai Leung J W.Analysis of yard crane deployment strate- gies in a container terminal[C]//Proceedings of ICC and IE Conference, 1996: 1187-1190.
  • 3Zhang C,Liu J,Wan Y W,et al.Storage space allocation in container terminals[J].TransP9rtation Research: Part B Meth- odoLogy, 2003,37 (10) : 883-903.
  • 4Cheung R K, Li C L, Lin W.Inter block crane deployment in container terminals[J].Transportation Science,2002,36( 1 ) : 79-93.
  • 5Zhang C,Wan Y W,Liu J,et al.Dynamic crane deployment in container storage yards[J].Transportation Research:Part B MethodoLogy, 2002,36(6) :537-555.
  • 6Kim K H.An optimal routing algorithm for a transfer crane in port container terminals[J].Transportation Science, 2003,33(1):17-33.
  • 7Ng W C,Mak K L.Yard crane scheduling in port container terminals[J].Applied Mathematical Modeling, 2005, 29 (3) : 263-276.
  • 8Chen L,Bostel N,Dejax P,et al.TaBu search algorithm for the integrated scheduling problem of container handling sys- tems in a maritime terminal[J].European Journal of Opera- tional Research,2009, 181:40-58.
  • 9Javanshir H, Seyedalizadeh Ganji S R.Yard crane schedul- ing in port container terminals using genetic algorithm[J]. Journal of Industrial and Systems Engineering,2010,6(11): 39-50.

同被引文献29

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部