基于人机协同模型的生产单元组织配置仿真 被引量:11

Organization configuration simulation of production cells based on human-machine collaborative model
下载PDF
导出
摘要 为优化生产单元的组织资源配置方式,将多主体建模与制造过程仿真相结合,建立了生产单元的人机协同仿真模型,给出了模型的结构框架、主体模型结构和模型集成技术。基于人机协同仿真模型,以某摩托车发动机关键零部件的典型生产单元为例,对制造团队的技能类型、技能水平和人机分工方式进行了仿真研究。仿真结果表明,操作人员技能等级以及操作员之间的协同工作方式对订单完成时间均具有显著影响,人机协同仿真模型可实现对各种组织资源配置方案的动态和定量评价,从而帮助制造团队对组织资源的培训及分配进行优化决策。 To optimize the organization resource configuration mode of product cells, a human-machine collaborative simulation model was constructed by combining the multi-agent modeling and manufacturing process simulation. The structure framework, agent structure, and model integration technology of this model were presented. Taking one typical production cell of motorcycle engine key parts as an example, simulation experiments for skill types, skill level, and work allocation of the organization were conducted based on human-machine collaboration model. The simulation results showed that the skill level and collaboration styles of operation staffs had significant impact on or- der fulfilling time. The human-machine collaborative simulation model realized dynamic and quantitative evaluation on the organization resource configuration, and therefore helped the production team make reasonable decision on or- ganization resource training and allocation.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2013年第3期499-506,共8页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(70971146) 高等学校博士学科点专项科研基金资助项目(20120006110034) 中央高校基本科研业务费资助项目(FRF-SD-13-004B)~~
关键词 生产单元 生产组织 资源配置 仿真模型 production cell production organization resource configuration simulation model
  • 相关文献

参考文献13

  • 1IRANI S A. Handbook of cellular manufacturing systems[J]. New York,N. Y. ,USA: Wiley, 2007.
  • 2MCCOMB S, GREEN S, COMPTON D. Flexibility's rela- tionship to staffing and performance in complex project[J]. Journal of Engineering and Technology Management, 2007, 24(4) : 293-313.
  • 3PRINZEL L J. Team-centered perspective for adaptive auto- mation design[M]. Washington, D. C. , USA: NASA, 2003.
  • 4孟飚,范玉青,林楠.模块化精益生产组织改造评估与决策[J].计算机集成制造系统,2006,12(7):1141-1145. 被引量:12
  • 5汤向东.大规模定制模式下的组织柔性取向[J].企业改革与管理,2004(12):24-25. 被引量:3
  • 6程序,吴澄.一种复杂项目调度问题的混合智能算法[J].计算机集成制造系统,2006,12(4):585-589. 被引量:10
  • 7DANGELMAIER W, MAHAJAN K R, SEEGER T, et al. Simulation assisted optimization and real-time control aspects of flexible production system subject to disturbanees[C]//Pro- ceedings of the 2006 Winter Simulation Conference: Washing- ton, D. C. , USA: IEEE, 2006 : 1785-1795.
  • 8LIN J S, CHAO O Y, JUAN Y C. Towards a standardised framework for a multi-agent system approach for cooperation in an original design manufacturing[J]. International Journal of Computer Integrated Manufacturing, 2009, 22 ( 6 ) : 494-514.
  • 9GARCIA R. Uses of Agent-based modeling in innovation/new produet development researeh[J]. Journal of Produet Innova- tion Management, 2010, 22(5) : 380-398.
  • 10ZHANG X, SCHMIDT L, SCHLICK C M, et al. A human task-oriented simulation study in autonomous production cells [J]. International Journal of Production Research, 2008, 46(18):1-29.

二级参考文献28

  • 1吴澄.现代集成制造系统导论[M].北京:清华大学出版社,2000..
  • 2刘铁铭 范玉顺.基于工作流的企业建模和仿真技术研究[M].北京:清华大学学报,2000..
  • 3Edward J.Williams." Simulation of A Plant Shop Power and Free Line," Proceedings of the 1997 Winter Simulation Conf.,1997.
  • 4I.H.Yavuz.," A kanban- based simulation study of a mixed model just- In- time manufacturing line,"Intl.Jnl.Production Resaerch1995,Vol.33.
  • 5HUTOP,Annual Report " Human Sensory Factors for Total Product Life Cycle",IMS Promotion Center Janpan,1999.
  • 6Paul,R.J,G.M.Giaglis ,1999.Integrating simulation in organization de sign study.International Journal of Information Management19(3).
  • 7Okdua.Y." Simulation of Human Cooperation for Human- Oriented Pro duction Process,"INTL.Conf.on Quality Control by Artificial Vision, 2000.
  • 8REYCK B D,HERROLEN W.A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations[J].European Journal of Operational Research,1998,111:152-174.
  • 9DORNDORF U,PESCH E,PHAN-HUY T.A time-oriented branch-and-bound algorithm for project scheduling with generalised precedence constraints[J].Management Science,2000,46:1365-1384.
  • 10NEUMANN K,SCGWINDT C.Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production[J].Operation Research Spectrum,1997,19:205-217.

共引文献22

同被引文献93

引证文献11

二级引证文献45