摘要
BOSS和CRM系统现用投资估算方法,不能很好地满足滚动规划的需要,本文通过对建设投资估算方法研究,结合BOSS和CRM系统投资特点,提出了一种新的估算方法。
Because of the common used investment estimation methods of BOSS and CRM could not meet the demands of telecommunication rolling planning, this paper presents a completely new method based on characterisics of BOSS and CRM, which greatly simplifies the process of investment estimation.
出处
《电信工程技术与标准化》
2013年第3期59-63,共5页
Telecom Engineering Technics and Standardization
关键词
滚动规划
BOSS
CRM
投资估算
比例法
telecommunication rolling planning
BOSS
CRM
investment estimation
proportion method