摘要
介绍了国内、外现行土荷载的计算方法,并通过对同一管沟内敷设多条管线的情况进行计算分析,提出了PCCP在多管同槽埋设情况下土荷载的具体计算方法。
The current calculation methods for soil loads at home and abroad are introduced. And by calculating and analyzing multiple pipelines installation in a single trench, the calculation method for solid loads of buried PCCP under the condition of multiple pipe installation in a single trench is put forward.
出处
《混凝土与水泥制品》
北大核心
2013年第4期29-32,共4页
China Concrete and Cement Products
关键词
PCCP
多管同槽埋设
土荷载
PCCP
Multiple pipelines installation in a single trench
Soil loads