明挖法地铁车站地基反力分析 被引量:2

Analysis of ground reaction forces on open-cut subway station
原文传递
导出
摘要 目前地铁主体结构较普遍地按弹性地基上的框架模型进行设计,计算结果与实际情况存在差异.结合地铁车站施工过程中地基土质变化及主体结构刚度的变化对主体结构内力及基础底板反力分布产生的影响,利用考虑土体非线性情况下的有限元分析结果,按照合力相等、分布形状近似的原则简化底板反力,从而使主体结构计算内力更接近于实际内力分布. In current time, the main structures of subways usually are designed as framework model on elastic foundation, the calculated results reflected the actual situation not well. Compared with the process of construction in the main structure of a subway station, the authors pay attention to the influence of the internal forces of main structure and ground reaction force when the foundation soil and structural stiffness change, using finite element analysis in the case of considering nonlinearity of the soil, and simplify the ground reaction force in accordance with the principle of force unchanged and approximate shape similarly, so that the calculation of internal force of main structure is close to the actual situation.
作者 胡纯 李大庆
出处 《武汉大学学报(工学版)》 CAS CSCD 北大核心 2013年第2期208-211,共4页 Engineering Journal of Wuhan University
关键词 地铁 明挖法 施工过程 结构刚度 subway open-cut method process of construction structural stiffness
  • 相关文献

参考文献2

二级参考文献9

  • 1JGJ94-2008建筑桩基技术规范[S].北京:中国建筑工业出版社,2008.
  • 2GB50157-2003地铁设计规范[S].北京:中国计划出版社,2003.
  • 3中华人民共和国国家标准.GB50157-2003,地铁设计规范[S].北京:中国计划出版社,2003.
  • 4罗世培,等.广州市地下铁道一号线工程设计总结[M].北京:中国铁道出版社,2002.
  • 5肖明,等.深圳地铁一期工程设计总结[M].北京:中国铁道出版社,2008.
  • 6王文栋.混凝土构造手册[M].北京:中国建筑工业出版社,2002.
  • 7中国建筑标准设计研究院,等.地下建筑防水构造[M].北京:中国建筑标准设计研究院,2002.
  • 8DGJ08-109-2004,上海城市轨道交通设计规范[S].
  • 9.GB50007-2002建筑地基基础设计规范[S].北京:中国建筑工业出版社,2002..

共引文献16

同被引文献22

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部