摘要
介绍了武汉地铁二号线小龟山车站基坑信息化施工监测体系构建方法:给出了优化的信息反馈流程:根据现场信息反馈的实际情况实现了钢支撑方案的优化和围护桩支撑挡墙方案的优化:达到了提高施工效益、降低安全风险之目的。
This paper mainly introduces the informational con- struction monitoring system of XiaoGuishan Pit in Wuhan Met- ro line II and the optimized information feedback process. Ac- cording to the actual situation of the site, an optimized program of steel support and PILE support retaining wall can improve the construction efficiency and reduce security risks.
出处
《测绘地理信息》
2013年第2期35-36,45,共3页
Journal of Geomatics
关键词
信息化施工
监控量测
信息反馈
安全预警
Information construction
Monitoring Measurement
Monitoring Feedback
Safety warning