600MW燃煤空冷机组特殊材料的焊接工艺

Special material welding process of 600 MW coal-fired air cooling unit
下载PDF
导出
摘要 为更好地了解空冷机组焊接施工,通过对某发电厂二期2×600 MW燃煤空冷工程#3机组工程的施工管理经验进行总结,重点对特殊材料主要部件的焊接工艺(如:SA335-P91焊口的后热、WB36钢焊接、TP347H的焊接)加以介绍,希望能给类似机组的安装施工提供一些借鉴。 In order to of air cooling unit welding construction can have a better understanding, through their participation in the installation of the observation of shanxi mountain power plant phase ii 2-600 MW coal-fired empty cold engineering #3 unit project construction management experience was summarized ,with emphasis on the special materials of the main parts of welding process (such as: SA335 - P91 joint of hot,WB36 steel welding,TP347H welding) were introduced,the hope can give similar unit installation construction and provide some reference ,this project won the 2009 annual national excellent welding engineering award.
出处 《电焊机》 北大核心 2013年第3期48-51,共4页 Electric Welding Machine
关键词 SA335-P91钢 WB36钢 TP347H钢 SA335-of P91 steel WB36 steel TP347H steel
  • 相关文献

参考文献5

  • 1郭军.DL/T819-2002火力发电厂焊接热处理技术规程[S].北京,中国电力出版社,2002.
  • 2国家电力公司电源建设部.T91/P91钢焊接工艺导则[S].北京,国家电力公司电源建设部,2002.
  • 3周荣灿,范长信.华能电厂P92管道焊接工艺实施细则提交版[S].北京:华能国际电力股份有限公司,2005.
  • 4周荣灿,范长信.华能电厂P91、P92管道现场焊后热处理工艺导则(试行)[S].北京:华能国际电力股份有限公司,2005.
  • 5周荣灿,范长信.华能电厂P91、P92钢焊接质量检验导则[S].北京:华能国际电力股份有限公司,2008.

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部