4Cherkassky B V, Goldberg A V. On implementing push-relabel method for the maximum flow problem[J] . Algorithmica, 1997, 19: 390-410.
5Kurtulus I, Davis E W. Multi-project scheduling: Categorization of heuristic rules performance [J].Management Science, 1982, 28 (2): 161-172.
6Kurtulus I, Narula S C. Multi- project scheduling: Analysis of project performance [J] . IIE Transactions, 1985, 17 (1): 58-66.
7M hring R H, Schulz A S, Stork F, Uetz M. Resource constrained project scheduling: Computing lower bounds by solving minimum cut problems [R] . Berlin: Technische Universit te Berlin, 1998.
8Tsai D M, Chiu H N. Two heuristics for scheduling multiple projects with resource constraints [ J ] .Construction Management and Economics, 1996, 14: 325-340.
9Lai Y J,Fuzzy Sets Systems,1996年,77卷,321页
10Lee Jaekwan,J Operational Research Society,1996年,47卷,5期,678页