期刊文献+

拉索式连梁装置设计参数对简支梁桥抗震效果的影响 被引量:4

Parametric design of unseating prevention devices for simply-supported girder bridge
下载PDF
导出
摘要 连梁装置是一种有效的防止桥梁在地震中落梁的措施.基于一座常见结构形式的简支梁桥进行了不同设计参数的拉索式连梁装置的非线性时程分析计算,文章结合已有的国内外连梁装置设计方法,研究不同设计长度和初始间隙等参数对连梁装置限位效果及内力的影响.结果表明:连梁装置的限位效果随着初始间隙的增大逐渐减小,当初始间隙大于设计位移量时,连梁装置不再发挥作用;拉索长度对限位效果影响不大,但长度较小的连梁装置会导致内力增大,使桥墩墩底的弯矩增大及损伤程度加剧. Unseating prevention device is an effective measure to prevent the bridge beam falling when bridge is hit by earthquake. In this paper, based on the existing domestic and foreign unseating prevention devices design method, the time-history analysis has been carried on a common structure in simply-supported girder bridge with different design parameters of unseating prevention devices, studying different design cable length and initial gap and other parameters of unseating prevention devices that limit the displacement and the internal forces effect. The results show that unseating prevention device limit effect gradually decreases with increasing initial gap, when the initial gap is greater than the amount of design displacement, unseating prevention devices work no longer; cable length affects the limiting of the displacement less, but smaller length of unseating prevention de- vices will result in increasing internal force and the bending moment at the end of pier and its injury severity.
出处 《广州大学学报(自然科学版)》 CAS 2013年第1期52-57,共6页 Journal of Guangzhou University:Natural Science Edition
基金 广东省交通科技资助项目(201002014) 广东省科技计划资助项目(2011A030200019)
关键词 简支梁桥 连梁装置 非线性时程分析 初始间隙 拉索长度 simply-supported bridge bridge restrainer nonlinear time history analysis initial slack cablelength
  • 相关文献

参考文献9

  • 1KARNOPP D. Active damping in road vehicle system [ J ]. Vehic Syst Dynam, 1983 (12) : 291-311.
  • 2杨军.防震减灾工程分类及其对策[J].震害学,2008,23(2):123-126.
  • 3刘健新,胡兆同.公路桥梁减震装置及设计方法研究[R].西安:长安大学,2000.
  • 4American Association of State Highway and Transportation Officials. Standard specifications for highway bridges, division I-A seismic design [S].
  • 5朱文正,刘健新.公路桥梁连梁装置研究[J].公路交通科技,2009(4):68-72. 被引量:15
  • 6PRIESTLEY M J N, SEIBLE F, CALVI G M. Seismic design and retrofit of bridges [ M ]. New York: John Wiley and Sons, Inc. 1996.
  • 7Japan Bridge Association. Guidance for design of unseating prevention devices [ R]. Tokyo: Tokyo Publication Co Ltd,2002.
  • 8彭天波,李建中,胡四德,等.双层高架桥的抗震性能[J].同济大学:自然科学版,2004,32(10):1355-1359.
  • 9JTG/TB02.1-2008公路桥梁抗震设计细则[S].

二级参考文献6

  • 1朱文正,刘健新,陈淮.梁桥搁置长度的计算方法比较[J].世界地震工程,2004,20(3):152-155. 被引量:5
  • 2高小旺,鲍霭斌.地震作用的概率模型及其统计参数[J]地震工程与工程振动,1985(01).
  • 3JTJ 004-1989.公路工程抗震设计规范[S],1989.
  • 4KAWASHIMA K,PENZIEN J.Correlative Investigation on Theo-retical and Experimental Dynamic Behavior of a Model BridgeStructure. Report No.EERC 76-26 . 1976
  • 5Priestlay MJ N,Seible F,Calvi G M.Seismic design and retrofit of bridges. . 1996
  • 6Clough R W,Penzien J.Dynamics of structures. . 1995

共引文献16

同被引文献19

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部