结合福州至永泰高速公路A 1合同段预制梁场建设及使用情况,在原设计方案的基础上,对软基地区100 t预制箱梁预制台座、存梁台座、龙门吊轨道基础进行了优化设计。
According to the construction and utilization of the prefabrication factory in Contract A1 for Fuzhou-Yongtai Expressway, some optimization based on the original design has been carried out on the prefabricated pedestal, the latch beam pedestal and the rail foundation of gantry crane for the 100t precast box beam in the soft foundation area.