期刊文献+

泥石流风险评价中若干问题的探讨 被引量:45

APPROACHES TO RISK ASSESSMENT OF DEBRIS FLOW
下载PDF
导出
摘要 介绍了自然灾害风险评价的一般模式及泥石流危险性和泥石流区域易损性的评价方法。探讨了危险度的指标选择及其量值表达 ,以及风险度和易损度的异同。论述了风险评价和环境评价的关系 。 For debris flow,risk is generally expressed as the product of hazard and vulnerability.Moreover,hazard is commonly expressed as the product of magnitude(intensity)and probability(frequency).However at present,magnitude and probability of debris flow are difficult to obtain, and the estimates are still rather inaccurate and uncertain.Therefore,five precise environmental parameters,i.e.drainage basin area,main channel length,drainage basin relief,drainage density and active channel proportion significantly related to the magnitude and probability,are supplemented for the hazard assessment of debris flow.This paper also introduces the method of regional vulnerability assessment of debris flow and the difference between the definition of risk and vulnerability.Finally the relationships between the assessments of risk and environment are discussed.Risk assessment is a part of environment assessment,and environment assessment should contain risk,hazard and vulnerability assessments.
作者 刘希林
出处 《山地学报》 CSCD 2000年第4期341-345,共5页 Mountain Research
基金 国家自然科学基金! ( 49771 0 0 4 ) 水利部水利科技重点资助项目!(SZ9831 ) 人事部 1 997年度非教育系统留学回国人员科技活动择优
关键词 危险性 易损性 风险评价 泥石流 hazard vulnerability risk assessment debris flow
  • 相关文献

参考文献7

二级参考文献29

共引文献141

同被引文献494

引证文献45

二级引证文献702

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部