摘要
本文介绍了新区2500m3高炉的高炉冷却系统水温差与热负荷监测系统的网络架构、性能要求和软件功能,简述了该系统应用在大型高炉上的必要性以及设备配置的基本要求。
In this paper, the water cooling system water temperature difference and the heat load monitoring system(including network architecture, performance requirements, software function) were introduced, the necessity to large blast furnace of the system application and the basic requirements equipment configuration were expounded
出处
《昆钢科技》
2013年第1期33-35,42,共4页
关键词
高炉
水温差
热负荷监测
blast furnace
water temperature difference
heat load monitoring