摘要
介绍尿素装置改造前的能耗,存在的问题,改造内容,以及改造后的消耗,装置运行情况。
Describe energy consumption, problems and revamping plan before the urea unit renovation. The energy consumption and the urea unit operation after revamping are also described.
出处
《化工设计通讯》
CAS
2013年第1期48-51,共4页
Chemical Engineering Design Communications
关键词
尿素装置
蒸汽耗
氨耗
改造
urea unit
steam consumption
ammonia consumption
revamping