期刊文献+

预应力管桩静压法施工技术与质量控制要点 被引量:3

Construction Technology of Static Pressing Method of Prestressed Pipe Pile and Key Points of Quality Control
下载PDF
导出
摘要 预应力管桩因其施工简便,越来越多地被应用于建筑工程的基础。常用的管桩一般为预应力高强混凝土管桩(PHC桩)和预应力混凝土管桩(PC桩)。其沉桩方法有多种,包括锤击法、静压法、震动法、射水法、预钻孔法等。本文以静压法施工为研究对象,简单论述静压法的施工技术和其质量控制要点。 Prestressed pipe pile is increasingly applied in the foundation of con- struction engineering due to simple construction. Frequently-used pipe piles include PHC pile and PC pile. Its pile-sinking methods include hammering method, static pressing method, vibration method, water jetting method and predrilling method. Taking static pressing construction as research subject, this article gives a brief explanation of construction technology of static pressing method and its key points of quality control.
作者 张志坚
出处 《住宅科技》 2013年第3期49-51,共3页 Housing Science
关键词 预应力管桩 静压法 施工技术 质量控制 prestressed pipe pile, static pressing method, construction technology, quality control
  • 相关文献

同被引文献12

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部